Adjusting clips in timeline view

Please use this part to report bugs & errors, ask questions & "How to..."
vishvakarma
Posts: 18
Joined: 19 Dec 2012, 19:11

Adjusting clips in timeline view

Post by vishvakarma »

Is there a way to adjust clips in the timeline view that don't effect the entire duration of the scene? Say I have nine clips in a scene and I want to slide clips 4 and 5 to adjust their timing but I don't want to effect the duration of the entire rest of the clip? Something akin to the Adobe Premier ripple edit or rolling edit tools? As I making my animatic I might notice where I want to add clips but then I have to readjust all the way down the line. Is there a way to just slide a clip's duration without effecting everything that comes after?
Elodie
Posts: 13912
Joined: 06 Jan 2009, 09:53
Location: Metz

Re: Adjusting clips in timeline view

Post by Elodie »

Unfortunately, there is no possibility to do any slide (or any fx) within the storyboard engine. If you are using première, you can publish your storyboard / animatic as an edl : it will export each clip separately and it will create a little file (.edl) that tells première to import vidéos in the good order :)

Kind regards,
Elodie
vishvakarma
Posts: 18
Joined: 19 Dec 2012, 19:11

Re: Adjusting clips in timeline view

Post by vishvakarma »

Merci Elodie,
That's a good work around. Is it then possible to reimport that Premier file back into TVPaint as clips with the corrected timing?
vishvakarma
Posts: 18
Joined: 19 Dec 2012, 19:11

Re: Adjusting clips in timeline view

Post by vishvakarma »

Oh wait. That won't work. Since it won't come back with all the layers that it originally had. Still I could adjust the time in Premier and emulate that back in TVPaint so it's still a good way to go. Thanks!
vishvakarma
Posts: 18
Joined: 19 Dec 2012, 19:11

Re: Adjusting clips in timeline view

Post by vishvakarma »

Okay. Not seeing .edl as one of my choices for export. Where do I find that? I'm running Pro 10.

Aha! After experimenting, I see if I export as a .mov file but "split scenes" in the dialogue box, it'll give me several .mov files all numbered in order. I can import all of those into Premier and edit there. That'll work!
Last edited by vishvakarma on 02 Mar 2015, 06:35, edited 1 time in total.
User avatar
Paul Fierlinger
Posts: 8100
Joined: 03 May 2008, 12:05
Location: Pennsylvania USA
Contact:

Re: Adjusting clips in timeline view

Post by Paul Fierlinger »

Can't you just switch to the thumbnail view and sort the clips out there by opening the one to be expanded as a Timeline Project and then return to the Timeline storyboard view? I've never had the need to do this but it's something that I would look into first.
Paul
http://www.slocumfilm.com
Desktop PC Win10-Pro -64 bit OS; 32.0 GB RAM
Processor: i7-2600 CPU@3.40GHz
AMD FirePro V7900; Intuos4 Wacom tablet
Elodie
Posts: 13912
Joined: 06 Jan 2009, 09:53
Location: Metz

Re: Adjusting clips in timeline view

Post by Elodie »

vishvakarma wrote:Okay. Not seeing .edl as one of my choices for export. Where do I find that? I'm running Pro 10.
Use "publish" and not "export" :)
User avatar
NathanOtano
Posts: 1209
Joined: 01 Apr 2014, 07:07
Location: Biarritz, France
Contact:

Re: Adjusting clips in timeline view

Post by NathanOtano »

vishvakarma wrote:Is there a way to adjust clips in the timeline view that don't effect the entire duration of the scene? Say I have nine clips in a scene and I want to slide clips 4 and 5 to adjust their timing but I don't want to effect the duration of the entire rest of the clip? Something akin to the Adobe Premier ripple edit or rolling edit tools? As I making my animatic I might notice where I want to add clips but then I have to readjust all the way down the line. Is there a way to just slide a clip's duration without effecting everything that comes after?
I agree

I'm storyboarding right now and i think that you can't time it correctly without being able to slide the moment when we cut from one clip to another.

It just means for me moving the out point of the first clip and the in point of the next clip the same number of frames to compensate (meaning that we can go negative in the next clip).
Because when we have sound there is no other way. You time the action and then you just want to move the cut. Or you work in one clip

I think it's possible to do a script but...
Working on Windows 10
Creator of Disnosc, providing storyboard, animation and design for 2D realistic pictural animation: https://www.disnosc.fr/ - nathanotano@disnosc.fr
Highly interested in animation workflows, I'm open to scripting new TVP functions for individuals and studios.
User avatar
Peter Wassink
Posts: 4437
Joined: 17 Feb 2006, 15:38
Location: Amsterdam
Contact:

Re: Adjusting clips in timeline view

Post by Peter Wassink »

Yes, it would be great to have cliphandles that work exactly like the instance handles in the layers do:
project timeline.gif
project timeline.gif (41.07 KiB) Viewed 24082 times
viewtopic.php?f=21&t=5899&p=82267&hilit=timeline#p82267




image from this thread:
viewtopic.php?f=21&t=5899&p=82267&hilit=timeline#p82267" onclick="window.open(this.href);return false;
Peter Wassink - 2D animator
• PC: Win11/64 Pro - AMD Ryzen 9 5900X 12-Core - 64Gb RAM
• laptop: Win10/64 Pro - i7-4600@2.1 GHz - 16Gb RAM
User avatar
schwarzgrau
Posts: 1238
Joined: 23 Jan 2012, 22:08
Location: Offenbach / Germany
Contact:

Re: Adjusting clips in timeline view

Post by schwarzgrau »

And again a +1 from me for Peters Rolling Edit suggestion
Windows 11 22H2 / TVP 11.7.0 PRO WIBU / Cintiq 22HD
Windows 11 22H2 / TVP 11.7.0 PRO WIBU / Mobile Studio Pro 16" (2019)
Android 13 / TVP 11.7.0 / Galaxy Tab 7 FE
INSTAGRAM
Elodie
Posts: 13912
Joined: 06 Jan 2009, 09:53
Location: Metz

Re: Adjusting clips in timeline view

Post by Elodie »

Interesting idea :)
User avatar
slowtiger
Posts: 2950
Joined: 08 May 2008, 21:10
Location: berlin, germany
Contact:

Re: Adjusting clips in timeline view

Post by slowtiger »

Although the idea seems logic, I think we have to play save here.

In a normal timeline (within a clip) I can at least see if the frames contain some artwork, so if I lengthen one instance I may erase another one, but at least I am aware of it, and can undo if necessary.

In the project timeline I don't have any visual indicator about this. If I legthen one clip and shorten another: which rules shall apply? I may erase existing animation without noticing.
TVP 10.0.18 and 11.0 MacPro Quadcore 3GHz 16GB OS 10.6.8 Quicktime 7.6.6
TVP 11.0 and 11.7 MacPro 12core 3GHz 32GB OS 10.11 Quicktime 10.7.3
TVP 11.7 Mac Mini M2pro 32GB OS 13.5
Elodie
Posts: 13912
Joined: 06 Jan 2009, 09:53
Location: Metz

Re: Adjusting clips in timeline view

Post by Elodie »

In Project - timeline view, when you stretch the clip, you actually change the "mark out" point, without affecting instances in the clip. So, it could affect "mark in", without deleting instances.
User avatar
Peter Wassink
Posts: 4437
Joined: 17 Feb 2006, 15:38
Location: Amsterdam
Contact:

Re: Adjusting clips in timeline view

Post by Peter Wassink »

Elodie wrote:In Project - timeline view, when you stretch the clip, you actually change the "mark out" point, without affecting instances in the clip. So, it could affect "mark in", without deleting instances.
Yes Elodie! I agree, thats how it should be done.
But then those markers become more important and should be made more visible in the clip timeline
So to make it very clear where the clip actually starts being vivible in the project view... maybe the "Mark in/out" need to get a continuous vertical bar like the bookmarks.
or we need to grey out the part of the timeline outside of the marked range.
Peter Wassink - 2D animator
• PC: Win11/64 Pro - AMD Ryzen 9 5900X 12-Core - 64Gb RAM
• laptop: Win10/64 Pro - i7-4600@2.1 GHz - 16Gb RAM
User avatar
NathanOtano
Posts: 1209
Joined: 01 Apr 2014, 07:07
Location: Biarritz, France
Contact:

Re: Adjusting clips in timeline view

Post by NathanOtano »

I made a temporary solution : http://forum.tvpaint.com/viewtopic.php?f=11&t=9724" onclick="window.open(this.href);return false;
But it's not perfect, especially because you have to always use Mark Outs and we don't have a shortcut to "activate it" in the script.
And it's not click and drag, you have to enter a number.
Working on Windows 10
Creator of Disnosc, providing storyboard, animation and design for 2D realistic pictural animation: https://www.disnosc.fr/ - nathanotano@disnosc.fr
Highly interested in animation workflows, I'm open to scripting new TVP functions for individuals and studios.
Post Reply