Change from 30 fps to 24 fps
Posted: 30 Oct 2013, 10:14
Hi everyone,
I am working on Mac, using the beta version of TVPaint 10.5.2 - 32 bit.
We made an animation at 30 fps whereas the whole production is 24 fps. We noted the mistake after making the animation.
So I changed the project fps with Modify Project >... to 24 fps.
The new timing is ok in TVPaint.
The problem is, when I export a MOV file H264 at 24 fps, Quicktime still tells me that my file is 30 fps. Yet the timing of the movie is ok, like in TVPaint.
We may have some problems if we import that file in our editing software.
Every other movie exported from a 24 fps TVPaint file, with the animation made at 24 fps from the beginning, is 24 fps for Quicktime with the same parameters (H264)?
Does anyones see a solution ?
Thanks a lot !
Marie
I am working on Mac, using the beta version of TVPaint 10.5.2 - 32 bit.
We made an animation at 30 fps whereas the whole production is 24 fps. We noted the mistake after making the animation.
So I changed the project fps with Modify Project >... to 24 fps.
The new timing is ok in TVPaint.
The problem is, when I export a MOV file H264 at 24 fps, Quicktime still tells me that my file is 30 fps. Yet the timing of the movie is ok, like in TVPaint.
We may have some problems if we import that file in our editing software.
Every other movie exported from a 24 fps TVPaint file, with the animation made at 24 fps from the beginning, is 24 fps for Quicktime with the same parameters (H264)?
Does anyones see a solution ?
Thanks a lot !
Marie